The project is a $1.05
billion investment built in two phases; Phase I will be completed in 2015 and
include the following elements:
·
520,000 sf of retail on
three levels. Store mix includes
mainstream mall stores as well as a department store, luxury goods, as well as
restaurant and entertainment venues.
·
A 265 room hotel with
85 serviced apartments for extended stays
·
Two 42 story
condominium towers each with 800 units
·
A wellness center
·
Two levels of
underground parking for 3,100 vehicles
·
Two 120,000 sf, 8 story
office towers
·
Redesign of the Eighth
Street Metromover station which will be incorporated into the complex
Phase II will be completed
in 2018 and will include a second office tower of approximately 700,000 sf.
The project will be located just west of Brickell Avenue between SW 6th Street and SW 8th Street.
The project will be located just west of Brickell Avenue between SW 6th Street and SW 8th Street.
(Image from Biz Journals) |
![]() |
(Project Area for Brickell CitiCentre) |
(All Renderings © Arquitectonica) |
Designed by Miami based Arquitectonica,
the open-air urban mixed-use project is expected to be a catalyst for other
development since its announcement last year.
In addition, the project is expected to have a significant long-term
economic impact on Miami and Dade county through annual property taxes, permit
and impact fees, as well as retail and bed taxes. For a review of the report authored by the Miami Economic
Associates, Inc. in April of 2011, see the Development Impact Study that
details the entire estimated $1.0 billion economic impact.
The short term benefits will
be enormous as well as an estimated 1,700 construction workers will evenutally flood
downtown Miami to work on the project.
Here is a video of the
development from Santidrian Real Estate:
For more information about
the project, check out these sources and articles:
The Miami Herald: Brickell CitiCentre Ready to Break Ground
Nice Project, This project make on 9.1 acres in downtown Miami. Now, It's not completed. This is a two phase structure project,phase one will be complete in 2015 and phase second will be 2018. The structure of around this project is beautiful. In includes malls, stores, luxury goods, restaurants, entertainment venues etc. It also include two levels of underground parking for 3,100 vehicles. The project is expected to have a significant long-term economic impact on Miami and Dade county through annual property taxes, permit and impact fees, as well as retail and bed taxes. Business Profile
ReplyDeleteThanks for the note, Ross. I appreciate your comments.
Delete